|
BUILDING:
-
exterior
-
completely repainted
outside of building in September 2006
-
steps freshly painted in August 2010
-
parking stalls
have electrical sites
-
oil tank replaced in June 2006
-
roof was
replaced 2-3 years prior to our ownership
- hallways lower
and upper level
-
ceilings and walls drywalled and painted
-
all new
rugs and baseboards
-
renovations made Jan/Feb/Mar 2009
-
commercial
linoleum at entrance
- interior details below
LOWER
LEVEL:
- one bedroom
apartment (suite #2)
- converted from office
space Oct, Nov, Dec 04, Jan 05
- partitioned
- new cupboards, kitchen taps, sink, new fixtures,
fan/rangehood
- new stove, used fridge
- electrical and plumbing
- one bedroom with closet
- new shower, vanity, toilet, taps, sink and mirror
- blinds
- air conditioner
- new doors
- new linoleum flooring
- fresh paint in 2007
- two bedroom
apartment (suite #3)
-
converted from office space
Oct, Nov, Dec 04, Jan 05
-
partitioned, new cupboards, new fixtures, taps and sink, fan,
rangehood
- used
stove and fridge with water dispenser
- some
blinds replaced
- new
doors
- new
linoleum and rugs
-
closet
-
drywalled and painted
- bathroom with tub, vanity, toilet, taps, sink mirror
- both
apartments have two entrances (front and side)
-
boiler room
-
2 commercial spaces (room #1 and room #3)
-
room #1 commercial space
- renovations done
in Jan/Feb 2009
-
replaced some
drywall
-
ceilings and walls painted (stippled)
-
new laminate flooring installed
room #3
commercial space
-
meeting room
- flooring - rug
-
two bathrooms
- one
bathroom
with toilet and vanity for use by 2
commercial spaces
-
second bathroom with toilet and vanity used by owner for storage
-
mechanical room
with 2 electrical panel boxes
-
new electrical panel box installed by electrician in
Oct 04-Jan 05
- other panel box was there by previous
owner
- room used for storage of owner's
maintenance and cleaning supplies
SECOND
LEVEL:
- two bedroom apartment with balcony
(suite #1)
- carpeted
- new fridge in June 2010
- stove
- air conditioner
- deck off of balcony redone in
October 2004
- freshly painted in Nov/Dec 2008
- new taps and ceiling fan in
bathroom November 2010
- 3 bachelor units (rooms #2, 4 and 5)
- bachelor unit - one room with
closet (#2)
- curtains
- air conditioning
bachelor unit - one room with closet (#4)
- carpet
- blinds
- air conditioning
- bachelor unit - one room with closet and storage unit
(#5)
- curtains and
air conditioning
- new sub floor
- new carpet in September 2009
- ceilings and
walls freshly painted in November 2010
- kitchen is shared by the three
units
- installed cupboards, double
kitchen sink, taps
- new fridge
- two-burner cooking
elements with stand
- renovations made in June 2002
- bathroom shared by
the three units
- toilet, vanity and new shower June 2002
|
DISCLAIMER:
We are not real estate agents. Listings on www.pin.ca are private offerings and the sale of any
investment unit listed on this website has not been qualified, endorsed
or recommended by any Federal, Provincial or Securities agency or
commission. Do your own due diligence with the help of licensed,
professional lawyers, accountants and investment counsellors. Do not
rely upon this, or related websites, for investment advice. We try to
provide quality information, but we make no claims, promises or
guarantees about the accuracy, completeness, or adequacy.
PIN has been operating
since 1998 and is ready for
major expansion.
Agents wanted worldwide --
click for details.
((Saskatchewan and Manitoba are already covered)
|